We take part in projects involving the construction of medium and high-voltage power lines, low/medium-voltage and medium/high-voltage substations, and SCADA systems.

We specialize in the execution of renewable energy projects, including:

We have experience working with all Distribution System Operators in Poland.

Wind Farm

Fw Warta 28,6 MW

Project Completion Date: May 2021 – December 2022

Investor: EDP Renewables, INTERTEK

The investment involved the comprehensive construction of the Warta Wind Farm with a capacity of 26MW. The works included the development of detailed design projects, construction of access roads, turbine foundations, installation of 13 wind turbines, a 110/30kV GPO station, a 110kV cable line, and a 30kV line. Additionally, the project covered the preparation of complete as-built documentation required for obtaining a Building Permit (PnB) and a concession, as well as conducting EON/ION/FON procedures. Our responsibilities included acting as the Contract Engineer (Lead Engineer Team Leader) and the Electrical Supervision Inspector for the entire scope of work.

OFFSHORE PROJECT

Connection of Baltic Power Wind Farm to National Power System

Project Completion Date: Jul 2024 - ongoing

Investor: Baltic Power, Telefonika Kable

The project involved the construction of the connection for the Baltic Power Offshore Wind Farm to the National Power System (KSE). The work primarily included the installation of four high-voltage cable line circuits at 230kV, totaling approximately 85 km of XRUHAKXS-SC-WTC-2T4FS 1x1000RMC/120 127/230 (245) kV cable. Our responsibilities included acting as the General Contractor’s (TFK) representative on-site (Lead Onshore Project Engineer) and serving as the electrical and telecommunications works manager for the project scope.

Photovoltaics

FV Siematycze

Project Completion Date: Jun 2024 – ongoing

Investor: ENERIS

The investment included the construction of a 10MW photovoltaic power plant (installed capacity) along with the necessary technical infrastructure and detailed execution designs. The project also involved the expansion of the electrical substation, connection of the PV plant to the 15kV grid, commissioning of the installation, and conducting all required tests and measurements in compliance with legal and technical standards. Additionally, the scope covered the preparation of as-built documentation and all necessary paperwork for approval by the Distribution System Operator (DSO) and obtaining the occupancy permit. Our responsibilities included serving as a technical advisor and acting as the electrical and structural supervision inspector for the entire scope of work.